Every week we get a CEO or IT director on the phone asking "how much does a web system cost?". The honest answer is awkward: we can't answer properly without understanding what you need. But that doesn't prevent you from showing up better prepared for the conversation.

In this article we open what sets the price of a web system in 2026: project type, volume, integrations, design, deadline and how much your team takes part. We also show everything that weighs on the budget (code, design, infrastructure, training, maintenance) and what to ask for to get comparable proposals. You leave knowing how to handle the next conversation with any vendor.

"How much does it cost" is the wrong question: and why this matters to you

When someone asks "how much does a web system cost", the question hides at least six variables. Each one can multiply the budget by 5 or 10. Asking for a number before aligning those variables is unfair to the vendor and dangerous to you: you'll hear the number they think you want to hear, not the real number.

  • What type of system? A marketplace MVP and an internal ERP cost orders of magnitude apart.
  • What's the expected volume? System for 50 users vs 50,000 users completely changes the architecture.
  • How many integrations? PIX, existing ERP, WhatsApp, external marketplace: each one costs in hours and in risk.
  • Custom design or ready-made components? System designed from scratch vs using Material Design / Bootstrap changes the UI budget by up to 30%.
  • Does your internal team collaborate? If you have product, design and QA in-house, the external team needed is smaller.
  • Is the deadline tight? A larger team working in parallel costs more, and non-linearly.

The good news: it's possible to understand what weighs on each project category before the first meeting. That's what we do next, showing what changes from one type to another and why the effort grows so much between them.

Project types and what changes between them

Each category below has its own scope profile: number of screens, user profiles, mandatory integrations, infrastructure demands and how much of the business has to be understood before the first line of code. That is what separates one project from another in a quote, long before the chosen technology. On our projects, design, development, QA, initial infrastructure and 30 days post-launch warranty are part of the scope. Ongoing maintenance is not: that goes in a block further ahead.

MVP / initial SaaS

To validate an idea or test a small product: 4 to 8 screens, basic authentication, CRUD for 2-3 entities, 1 simple integration (Stripe, PagSeguro, PIX direct) and a lean admin panel. Usually no separate mobile app, just responsive.

  • Ideal for: testing product-market fit before heavy investment

Internal system (intranet, control, workflow)

A system that automates a process inside the company: expense approval, production control, ticket management, scheduling, asset tracking. Typically 10 to 20 screens, user profiles (admin/manager/operator), PDF/Excel reports and basic dashboards.

  • Ideal for: replacing an Excel spreadsheet that became Frankenstein

Custom ERP / management platform

Backbone operation system: financial, inventory, sales, HR integrated in one place. 40+ screens, multiple profiles, mass imports, mandatory tax integrations (electronic invoicing, fiscal reporting), executive dashboards. These projects usually have the client's internal team collaborating (controller, operations manager).

  • Ideal for: company that grew beyond what off-the-shelf ERP handles

Marketplace or 2-sided platform

Platform with sellers and buyers: catalog, advanced search, cart, split payment between marketplace and seller, ratings system, basic anti-fraud, seller panel. Usually also needs mobile version (PWA or native app). Development time explodes with each specific business rule.

  • Ideal for: aggregating offers from multiple suppliers in a single channel

Scalable multitenant SaaS

SaaS product that will serve many clients in isolated environments, with recurring billing, granular plan control, white-label, public APIs and SDK. The ceiling here is high: robust products for large teams (think Pipedrive, Linear, ContaAzul style) cost many times more than an MVP. The ROI comes from the recurring revenue.

  • Ideal for: product you'll sell as subscription to 100+ clients

All of this assumes custom development with qualified team in Brazil. For context about alternatives that come up often:

  • Off-shore (India, Vietnam, Argentina): can cut 30 to 50% of direct cost, but has hidden costs (remote management, timezone, rework time, legal difficulty if something goes wrong). Pays off in medium-large projects where you have a dedicated bilingual PM.
  • Low-code (Bubble, Retool, Glide, Webflow): delivers part of the MVP at a fraction of the cost. Limited to cases without heavy flow customization or complex business rules. Good for cheap MVP, bad for scaling.
  • Single freelancer: cheaper on small projects, but doesn't scale: when they go on vacation or drop the project, you're left with no one who knows the context.

What goes into the price: the real composition

When you see an ERP quote, that number is the sum of these components (with project-specific variation):

  • Discovery and planning (5-10%): business immersion workshops, product roadmap, navigable prototype, requirements documentation.
  • UI/UX Design (10-15%): wireframes, design system, high-fidelity final screens, usability adjustments.
  • Development (50-60%): frontend, backend, database, internal and external APIs, integrations.
  • QA and testing (10-15%): automated tests, exploratory manual testing, bug fixes.
  • Initial infrastructure (5-10%): cloud setup (AWS / Google Cloud / Azure), CI/CD, monitoring, backups, SSL.
  • Management and communication (5-10%): weekly meetings, documentation, risk management, continuous stakeholder communication.

If a quote comes with 90% in "development" and nothing in design or QA, watch out. Either those costs got swept under the rug (and will turn into production bugs later), or the vendor simply won't deliver those stages.

Watch out for "fixed-scope" pricing

Software is not civil construction. The scope of a system changes during development: you discover things you hadn't seen before. Those who offer rigid fixed pricing usually do one of two things: (a) overcharge to protect against risk, or (b) deliver the minimum written in the contract and charge extra for everything left out. Sprint/milestone-based pricing is more honest.

Total cost: year 1 vs subsequent years

The development price is just the entry ticket. The right question is "how much will it cost to keep this system running for 3 years?". Many companies invest in an ERP and then discover they need a significant extra budget just to keep it alive. It's not a scam, it's the nature of software.

Year 1 (with launch)

  • Development: the number from the previous section
  • Hosting and infra: USD 40 to USD 1,000/month (varies a lot by load and architecture)
  • Post-launch maintenance: 15 to 25% of the project's original value (fixes, adjustments requested by users in the first 90 days)
  • Licenses and SaaS: transactional email (SendGrid, Postmark), monitoring (Sentry, Datadog), CDN, upload antivirus: USD 20 to USD 400/month
  • User training: varies with team size and the number of user profiles involved

Years 2 and 3

  • Maintenance: 15 to 20% of the original value annually (fixes + small evolutions included)
  • Hosting: tends to grow with usage (10 to 30% per year)
  • New features: quoted separately when demanded, not included in "maintenance"
  • Stack updates: every 18-24 months, there's a cost to update framework versions (React, Node, etc.) to keep things secure

Rule of thumb: plan 50 to 70% of the development value over the first 3 years for maintenance and operation combined. Whoever ignores this discovers it when the system breaks and no one in the company remembers how it works anymore, or worse, the original vendor vanished.

"The biggest cost of software isn't development, it's the maintenance of a poorly-built system. The company that saves on development and spends many times more fixing it over the next 2 years is the typical client who comes to us asking for a rewrite."

How to request a quote that makes sense

To get comparable proposals from different vendors, come prepared. What looks like "wasting time writing a brief" saves months later.

  • Project type and business objective in 1 sentence: "B2B freight quote platform to shorten negotiation from 5 days to 1 hour".
  • Essential features vs nice-to-have (separate lists): prevents nice-to-haves from entering the scope and inflating the price.
  • Expected volume in the first year: number of users, transactions per day, simultaneous integrations.
  • Mandatory integrations: current systems (which ERP? which CRM?), external APIs (PIX, WhatsApp, e-invoicing), single sign-on.
  • Desired launch deadline and what changes if delayed: marketing event, end of contract with current system, seasonality.
  • Budget range you have: yes, say it. Those who don't say it get proposals in the dark: the vendor will guess high to cover risk.
  • Who decides and in what timeframe: align expectations on the evaluation timeline.

With this brief, you get truly comparable proposals. Without it, you'll compare apples to oranges: each vendor will assume something different about scope and prices will vary 3 to 5x without real technical reason.

Need a real proposal?

Send us a quick brief on WhatsApp: in 30 minutes we understand your case and you get scope, timeline and price fixed per stage, in a written proposal.

Request a quote

Signs of a trustworthy vendor (and who to avoid)

Beyond price, some signs help separate serious vendors from those who will become a headache in 3 months:

Positive signs

  • Asks hard questions in the first meeting (business rules, critical flows, plan B if something fails)
  • Shows portfolio of similar projects at the same size, with complete cases (problem → solution → result)
  • Offers sprint/milestone model instead of "fixed price by rigid scope"
  • Has their own team, not a freelancer intermediary
  • Technically documents what they deliver (you or another vendor can maintain it later)

Warning signs

  • Fixed price delivered in 24h without detailed brief
  • Refuses to sign NDA before the commercial meeting
  • Promises unrealistically short timelines (3 months for a full ERP = lie)
  • Wants 100% upfront payment
  • No active company registration, verifiable physical address, or contactable references

Conclusion

A well-built web system isn't a cost, it's an investment that pays back 2 to 5 times in productivity or new revenue channel over 3 years. The price varies a lot between an MVP and a robust SaaS, and what most decides the final number isn't the chosen technology, it's how clear your company is about what to deliver and what to measure.

If you're at that decision point and want a frank conversation, talk to us. In 30 minutes we understand your case and send back scope, timeline and price fixed per stage, in a written proposal.

Frequently asked questions

Is it possible to build a system for less?

Yes, using low-code tools (Bubble, Retool, Glide) or hiring individual freelancers. Works for small scopes and ideas to validate (up to 10 users, no major integration). Above that, technical limits show up fast and the initial savings become double spending when you need to rewrite.

Why do two quotes for "the same project" come out so different?

Because the scope in each vendor's head is different. Who charges less may be removing things (custom design, automated tests, documentation, training) that the expensive one is including. Asking for detailed deliverables in the proposal solves it: when deliverables are in the same spreadsheet, price becomes comparable.

Can I pay in installments?

Yes, the standard is splitting in milestones (downpayment + monthly deliveries or per sprint). Vendors offering structure like "30% down / 40% during / 30% on final acceptance" have risk alignment with you. Those who want 100% upfront, avoid. Those who accept 0% down, be equally suspicious (either desperate for cash, or will abandon mid-project).

How long does a custom ERP take?

It depends on scope: number of modules, mandatory tax integrations, volume of data to migrate and how much the client's internal team takes part. The timeline comes in the proposal, together with the delivery milestones and what is ready at each one. Be suspicious of anyone who fixes a schedule before seeing the scope: either they have an off-the-shelf product disguised as "custom", or they will delay and charge more for it later.

Is it worth starting with a lean MVP and evolving?

Almost always yes. A lean MVP gives you real product and user validation before investing in the complete version. Most of Reiko's large systems started small, validated hypothesis and grew in 2-3 month cycles. Investing everything in the complete version before validating is like building a tower without foundation.